Patroclus Facility Upgrade

Santos, (Cooper MSA 2024), SA
Replacement of the two (2) current corroded tanks, installing new tanks and abandoning the current tanks in situ; Integration of a third production tank.
Fit out of the ladder and access platforms to the tanks.
Replacement of the corroded pipework at the site, Installation of new pipework at the site and civil modifications for increase in assets at the site.
E&I field work for the 3 new tanks: installing instruments, running cable tray, Unistrut and cables, control panel modifications, earthing grid requirements, implementation of SCADA control updates.