Moomba – Port Bonython Pipeline Repairs

South Australia, 2025-2026

We delivered multiple live pipeline repairs across multiple sections of the Moomba to Port Bonython Liquids line.
Project included multiple live digs along the line with several different repair methods including:
– PETROSLEEVE® Install
– Blast and Wrap with STOPAC

Global are now certified to deliver PETROSLEEVE® repairs including final sign off.

Scroll to Top