Beach Energy, $2M, SA
With only a 48h shutdown window available, GEC constructed the twin facility duplication within 6h by optimising construction approach, 42h faster than scheduled.
Constructed production & dewatering tanks, duplication of shipping facility including charge pumps, filter & strainer baskets and shipping pumps. Instrument air system, Electrical Equipment Room, switchboards and VSD’s, Facility Pipework, Generators & associated fuel system.