Darwin Life Extension – Darwin Pipeline Duplication Scope

Santos (subcontracted to UGL)
SMPEI Installation of Inlet and Metering infrastructure associated with new DN850 high pressure pipeline at the Darwin LNG facility.
Range of piping diameters installed up to DN850 Heavy Wall and large manual and control valving. Field fabrication, pressure testing and mechanical tie-ins to existing process.
E&I installation of transmitter, metering, actuated valving, and fire & gas systems.
Global provided construction management, supervision, engineering, and labour resource support.