Cooper NEC4 MSA 2025

Jan-Dec 2019
Santos, $64.5, SA
Construction of 49 gas leases, 5 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU).
Installation of all support equipment (generators, fuel tanks, VSD, fencing, chem inj, sumps) commissioning support for: 26 electric beam pumps, 2 electric submersible pumps.Gathering Pipelines km: 164 (74% welded steel, 26% screwed connections)
Gas lease infrastructure built: 54
Beam pumps constructed: 26
Other Oil pumps: 2,