Cooper NEC4 MSA 2024

Jan-Dec 2024
Santos, $65M, SA
Construction of 39 gas leases, including 19 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU). Multiple Carbon-Capture-Storage wellhead tie-ins. Several facilities scopes of works for Santos. 

Installation of all support equipment (generators, fuel tanks, VSD, fencing, chem inj, sumps) commissioning support for: 6 electric beam pumps, 1 dual electric beam pump, 10 Electric LRPs, 1 ESP. Installation of shipping pump, decommissioning and demolish Big Lake pipeline, SCP pull through of existing flowline, screw compressor upgrades, HDPE flowline.
* Gathering Pipelines km: 65 (85% welded steel, 15% screwed connection)
* Gas lease infrastructure built: 39
* Beam pumps constructed: 8