Cooper NEC4 MSA 2023

Jan-Dec 2023
Santos, $70.7M, SA
General scope of works: Construction of 35 gas leases, 23 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU). Multiple Carbon-Capture-Storage wellhead tie-ins. Dedicated facilities team working direct for Santos. Installation of all support equipment (generators, fuel tanks, VSD, fencing, chem inj, sumps) commissioning support for: 17 electric beam pumps, 1 electric submersible pumps and 5 linear rod pumps.
* Gathering Pipelines km: 164 (89% welded steel, 11% screwed connection)
* Gas lease infrastructure built: 58
* Beam pumps constructed: 17 Other Oil pumps: 6