Jan-Dec 2022
Santos, $51.2M, SA
Construction of 34 gas leases, 12 multi-pad leases. (Metering skids, cross lease piping, E&I, solar RTU)
Installation of all support equipment (generators, fuel tanks, VSD, fencing, chem inj, sumps) commissioning support for: 4 electric beam pumps, 3 electric submersible pumps and 8 linear rod pumps.Gathering Pipelines km: 77 (87% welded steel, 13% screwed connection)
Gas lease infrastructure built: 46
Beam pumps constructed: 4
Other Oil pumps: 11