Cooper NEC4 MSA 2021

Jan-Dec 2021
Santos, $49.8M, SA
Construction of 61 gas leases, 2 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU) Installation of all support equipment (generators, fuel tanks, VSD, fencing, chem inj, sumps) commissioning support for: 2 electric beam pumps, 6 electric submersible pumps.Gathering Pipelines km: 115 (94% welded steel, 6% screwed connection)
Gas lease infrastructure built: 63
Beam pumps constructed: 2
Other Oil pumps: 6