Cooper NEC4 MSA 2020

Jan-Dec 2020
Santos, $44.5, SA
Construction of 36 gas leases, 12 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU).
Installation of all support equipment (generators, fuel tanks, VSD, fencing, chem inj, sumps) commissioning support for: 18 electric beam pumps, 4 linear rod pumps.Gathering Pipelines km: 116 (80% steel welded, 20% screwed connection)
Gas lease infrastructure built: 48
Beam pumps constructed: 18
Other Oil pumps: 4

Scroll to Top