Santos, (Cooper MSA 2023), SA
Big Lake Facility Modifications:
Shutdown over 4 days with 24 hours ops. 3 crews total of 20. Emergency repair and remediate pipeline after large scale loss of containment.
Interfaced with Santos team to mitigate widespread environmental impacts.
Specialist equipment: Breathing apparatus, flange spreaders, line up equip