Lycium Pump Duplication & Bauer Pump Duplication
2020Beach Energy, $2M, SAWith only a 48h shutdown window available, GEC constructed the twin facility duplication within 6h by optimising
2020Beach Energy, $2M, SAWith only a 48h shutdown window available, GEC constructed the twin facility duplication within 6h by optimising