Beach Middleton Compressors
Beach Energy, 2026, SAInstallation of two Enerflex compressors, all footings, electrical, and connecting pipelines.Scope included earlier demolition works and modification […]
Beach Energy, 2026, SAInstallation of two Enerflex compressors, all footings, electrical, and connecting pipelines.Scope included earlier demolition works and modification […]
Santos (subcontracted to UGL)SMPEI Installation of Inlet and Metering infrastructure associated with new DN850 high pressure pipeline at the Darwin
Fast-tracked repurposing project to convert the Ethane pipeline to natural gas. Facilities construction works at APA’s Moomba A & B
Santos, (Cooper MSA 2024), SA, QLDUpgrading 10 existing 15-25yrold 12T Sage Energy Corp compressors to have remote ops capabilities. This
Santos, (Cooper MSA 2024), SAConstruct DN225 PE100 HDPE rundown water line and associated CS tie-in piping. Partially buried sections including
Santos, (Cooper MSA 2023), SAConstruction of the replacement oil storage and loadout facilities. Assemble and install all tank stands, footings
Santos, (Cooper MSA 2023), SA16.5kms DN100 and 2.2kms DN150 near Moomba. Scope included gathering line offtake facilities (1PGS gas lease),
Jan – June 2023Lynas Rare Earths, $7.3M, WA1000m 10″ gas pipeline from APA’s Goldfields Gas Pipeline to connect Lynas Rare
Jan-Dec 2022Santos, $51.2M, SAConstruction of 34 gas leases, 12 multi-pad leases. (Metering skids, cross lease piping, E&I, solar RTU)Installation of
Jan-Dec 2021Santos, $49.8M, SAConstruction of 61 gas leases, 2 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU) Installation