Beach Middleton Compressors
Beach Energy, 2026, SAInstallation of two Enerflex compressors, all footings, electrical, and connecting pipelines.Scope included earlier demolition works and modification […]
Beach Energy, 2026, SAInstallation of two Enerflex compressors, all footings, electrical, and connecting pipelines.Scope included earlier demolition works and modification […]
Santos (subcontracted to UGL)SMPEI Installation of Inlet and Metering infrastructure associated with new DN850 high pressure pipeline at the Darwin
Jan-Dec 2025Santos, (Cooper MSA 2025), SAProvided assistance with Port Bonython Cooler Banks work, Santos Moomba shutdown
Jan-Dec 2024Santos, $65M, SAConstruction of 39 gas leases, including 19 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU).
Santos, (Cooper MSA 2024), SACold cutting, pressure grouting campaign to decommission sections of Big Lake pipeline. This work followed from
Vali & Odin 1 Oct 2022 – May 2023Odin 2: Nov 2024Vintage Energy, $5.6M, QLD/SADevelopment of the Vali gas field
Santos, (Cooper MSA 2023), SATo support a new Low-Low Pressure (LLP) Compressor at Tirrawarra Satellite station, Global installed the tie-in
Aug 2022 –Jun 2023APA Group, $15M, WA6 separate facility sites constructed as part of the 585km NGI Pipeline project.All sites
Santos, (Cooper MSA 2022), SACut into the existing Moomba 50 gas flowline to install additional midline risers. Scope included shut
Santos, SACold cutting, pressure grouting campaign to decommission sections of Big Lake pipeline. This work followed frSantos, SA12 Pipelines, large