Beach Middleton Compressors
Beach Energy, 2026, SAInstallation of two Enerflex compressors, all footings, electrical, and connecting pipelines.Scope included earlier demolition works and modification
Beach Energy, 2026, SAInstallation of two Enerflex compressors, all footings, electrical, and connecting pipelines.Scope included earlier demolition works and modification
Jan-Dec 2019Santos, $64.5, SAConstruction of 49 gas leases, 5 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU).Installation of
Santos, (Cooper MSA 2024), SAReplacement of the two (2) current corroded tanks, installing new tanks and abandoning the current tanks
Santos, (Cooper MSA 2023), SABig Lake Facility Modifications:Shutdown over 4 days with 24 hours ops. 3 crews total of 20.
Jan-Dec 2023Santos, $70.7M, SAGeneral scope of works: Construction of 35 gas leases, 23 multi-pad leases (Metering skids, cross lease piping,
Santos, (Cooper MSA 2023), SA16.5kms DN100 and 2.2kms DN150 near Moomba. Scope included gathering line offtake facilities (1PGS gas lease),
Nov 2022 – Sep 2023APA Group, $5.6M, SA & NSWThree facility upgrades including installation of pressure reduction stations (PRS) to
Santos, (Cooper MSA 2022), QLD22kms DN100 steel pipeline, end of line facilities, pigging and scraper stations. Construct artificial lift (Beam
2020Beach Energy, $2M, SAWith only a 48h shutdown window available, GEC constructed the twin facility duplication within 6h by optimising
Jan-Dec 2020Santos, $44.5, SAConstruction of 36 gas leases, 12 multi-pad leases (Metering skids, cross lease piping, E&I, solar RTU).Installation of